Monday, August 25, 2025

The Great Northern Estate Update Phase 2

So at the end of the last post we were up to summer 2024 and nearly the end of phase 1. You might think this post would be about ending phase 1 but that would include finishing the downstairs floors. If that happened the floor in the living room would get ruined by the work upstairs so we'll pause phase 1 for now.

Phase 2 begins upstairs. As bought the house had 4 bedrooms upstairs. With the removal of the stairway to nowhere three of those bedrooms are all in a line, which is no fun. That northern bedroom was really small and there was only one bathroom in the house so why not turn that little bedroom into an upstairs bathroom and a walk in closet.

The original plan had it as a half bath but Angie and I pushed for a shower and I'm glad we did. It essentially makes the upstairs a little apartment. Its nice to not have to traipse through the kitchen to take a shower.


Bathroom on the left, walk in closet on the right. Well, it was supposed to be a closet. My parents wanted a little bed in there, so for now we're using it as a bedroom.




With the upstairs bathroom and closet finished the guys moved on to the master bedroom. This didn't require a whole lot, new trim and better paint. Electric and insulation had been done by one of the Cushman brothers at some point in the past.

The floor in the master bedroom has been stripped but not refinished. Unfortunately its had a lot of traffic since the finish was taken off so when we do the rest of the floors this one will need to be sanded too but fortunately it'll just be a quick sand to take off the wear. I'm tentatively planning on refinishing the floor in the little bedroom and the master bedroom last summer but that will depend on replacing the windows in the master bedroom.

Actually the big holdup right now is the fact that we've used the house all summer. The guys really only get access from late November through mid-May. I think they had planned to work into the summer but my parents are much more comfortable in the house than the camp, the indoor bathroom being an important feature.

At some point last winter the roof leaked a little around the chimney into the downstairs bathroom. The guys gooped up the joint which stopped the leak but that meant we needed to shift focus and get a new roof.


This will be a standing seam metal roof but we opted for an inch of foam insulation. There isn't much insulation in the roof of the house. We intend to add more but there is only so much you can do so this will help.
I left before the metal started going on, it should be done by now.

Technically the roof is phase 3 but this is one of those things we didn't feel comfortable putting off. It'd be stupid to spend all that money on the inside to have it ruined by a leaky roof. Fortunately this kind of investment is once in a lifetime, I should never have to mess with the roof again.

Wednesday, August 13, 2025

The Great Northern Estate Update Phase 1

I realize I've been remiss in updating you on the state of Cushman House

Fall 2020:



Summer 2024:


A pretty good transformation right?

In my head I've broken this project roughly into 3 phases. Right now we've nearly completed phase 1 which is to rebuild the downstairs. Phase 2 takes us upstairs including re-working the stairs themselves which are too narrow and steep.

To that end we've rebuilt the kitchen, bathroom and dining room entirely. Thats new windows, exterior doors, flooring, insulation, electric, plumbing, ceiling, cabinets, lighting, shower, and toilet. The only thing original is the kitchen sink and fridge.




I didn't really want the laminate flooring but the glue on the old flooring would have been very difficult to get off the hardwood underneath. I'm particularly pleased with exposing the chimney, I think it looks great. Our builder was doubtful. There is something about folks around here that makes them want to hide a chimney.

The living room and downstairs bedroom (formerly a parlor) got new insulation, electric, windows and wallboard. The bedroom also got a closet:

These old houses never have any closet space and we were lucky to have somewhere to put this one.

Oh and before I forget the reconfiguration of the bathroom had us saying goodbye to the stairway to nowhere:


Its such a weird stairway that it bears explaining. I'm taking the picture from a very small bedroom on the north end of the house. The stairway Angie is coming up ends at a chimney. So there are 2 little like proto-steps that brought you into the bedrooms. I wouldn't have wanted to negotiate those in the middle of the night. 

The spot where Angie is standing in the picture is now the bathroom vanity down stairs.

Still to come in phase 1 is the ceiling in the living room and bedroom and refinishing the floors in those rooms.

Wednesday, September 20, 2023

Progress on the great northern estate

 


You might remember the house and barn we bought in northern Maine. After mucking about for a couple years I finally made contact with the builder who worked on our camp and got him to work on the house.

Step one was to put garage doors on the south end of the barn.

The original builder never bothered to put doors into those openings, they were covered with a kind of conveyor belt like matting used for making paper. This spring I spotted a raccoon sneaking in through a gap and knew we needed to do something.

One substantial application of money later and we've got doors. If you look carefully you'll notice that the cap between the garage doors and the hayloft door has increased. The door openings were originally 9'x9'. Nine foot tall garage doors are very expensive, like double the price, so our builder shrank the door opening a foot and put in 8'x9' doors. We don't need the big height here because of the big barn doors on the east and west walls which allow the tractors to pass through.



Looking back at these old pictures I'd forgotten how much stuff was in the house...

The next plan is for the kitchen and bathroom. As a summer house you could get away with bad windows and no insulation in bedrooms but you can't really use a house that has no kitchen or bath.

Of course the first step is demolition.

This is ahead and to the right of the first picture above. I actually did this work, there was a little stub wall where the ladder is, which I removed. The window in the left of the picture has been removed. That's the north wall of the house which is the coldest so a window there is kind of silly. The window in the center of the picture has been replaced with a larger one.


This is facing into the bathroom looking north. The window pictured here has been replaced with one just over half the height. I like having natural light in the bathroom but there is no need for a big window. This door is new, this used to be the "stairway to nowhere" which went up and stopped at a chimney with little steps up to the right and left to get into bedrooms.

Looking into the bathroom facing west, this is where the door used to be. The shower will be just on the other side of this wall. We decided to go with a stand up shower rather than a tub, who takes baths anymore?

I talked to the builder this week, the drywall is all hung and kitchen cabinets are ready to go in. This project has consumed way more money than I expected but this is really the most expensive phase of construction because of needing to buy things like cabinets and the shower and whatnot. Hopefully in a few weeks I'll have an update where things are going in, not just getting torn apart.

Tuesday, January 3, 2023

Plumbing and electrical

 So here we are again, 2023 is upon us and I've forgotten to update the blog for 6 months...

It feels like just yesterday since I updated but clearly not.

This week I'll be working on few posts to bring us back up to date. For today lets dial back to July.

You might remember our house in Maine:

In 2021 we repainted the house and rebuilt the enclosed porch. The idea is to stop the house from disintegrating before starting any upgrades. In 2022 I decided to continue down the same path when I discovered that the water pipe to the toilet was leaking.


Thus embarked a weekend long odyssey of pluming. Here we've got the pump and pressure tank. Those have been left alone but notice the blue pipe heading up, that's 3/4" PEX. I did have to sweat in a copper to PEX adapter which was surprisingly easy but from there on almost all of the the plumbing is plastic.

I've been a plumbing traditionalist in the past, not wanting to use "those new fangled things" but honestly PEX is the way to go. I installed the entire cold water system in one day and could have done it in less with better planning. With copper I'd have been at it for several days.


My original plan only involved replacing the cold water system, as shown here. Everything in blue is new PEX, the hot water side is still copper. I did that because I still haven't installed the hot water heater, so there really wasn't any point in doing the hot water side. Then I decided I'd link the hot water side to the cold water side. This would result in both faucets running cold water but it would at least let the hot water faucet do something. In the picture you can just spot a little red pipe from the cold to the hot.

This turned out to be a terrible idea, all the hot water pipes (unused for many years) leaked. So I took another day and replaced those as well.


This is 3/4" PEX running along the outside wall of the house. Since all the fixtures in the house are in line with each other what I should have done was run one 3/4" trunk line and then spur off with 1/2" lines to each fixture. I'd have used less pipe and it'd be a better looking install. Probably in 2023 I'll redo all of it, I'm planning to relocate the kitchen sink anyway so I'll do both at the same time.


This is the new bathroom vanity. It replaced a very ugly, early '80s unit that was installed with galvanized pipe that had very nearly corroded away...

Anyway, with the PEX installed we were no longer one plumbing leak away from a flooded basement. Even with my ugly install things are way better than they were. So I turned my efforts to electrical.

On the electrics side the first thing I did was wire in basement lights. There were a few lights down there but not enough and not done in a safe way. Now we have 4 foot LED lights wired to a common switch and a good, grounded, outlet. This makes working in the basement much more pleasant and safer.

The next step was to address the well pump wiring. I've been told the pump itself is probably from the 1920s.


This is the old setup, we're looking directly above the pump, the pump you can see in the picture is the old "soft water" pump that was used to move rain water from a cistern. That system has been disconnected from the plumbing for years but the pump was still connected to the electrics via the left side switch at the top of the picture. The right side switch that you can barely see in the picture powers the well pump. What you can't see is the copper pipe that used to run between them. This was not what you'd call a safe install. Also notice the top of the ladder in the left of the picture. Those switches are eight feet off the ground, very difficult to access.


This is after, I've added the piece of plywood to protect the switch in case the pump blows up, I've located it lower so it's much more convenient and I've used 12ga ROMEX wire directly from a 20a circuit breaker.  

I still need to repair/replace the pressure switch on the pump. It'll work if you tap it but it gets stuck between uses and we run out of water pressure until the switch gets tapped again. I think this is just because it doesn't get used enough. I have another pump with pressure switch I could put in it's place which would undoubtably be quieter than this one but part of me thinks that this thing has been working for 100 years I should probably keep it.


So what's on tap for 2023? This *should* be the year for upgrades. We spent some time in November working on the kitchen and have the old plaster and lathe mostly removed. I need to shore up ceiling a little and remove a little stub of wall and then wire in electrics. I want to be able to run the microwave and toaster oven at the same time so I'll be running at least three circuits, plus one for an electric stove. Eventually I think we'll go to a propane stove but short term a used electric stove is cheap.

Once the wiring is done I want to replace the two kitchen windows. The one facing east is too small, it'll be over the sink so I want something fairly large. The other one is a reasonable size but I want them to match...

After windows I'll get the kitchen spray foamed. Foam insulation offers the highest R-value for thickness and seals the room against drafts. There is a chance I'll get the bathroom done at the same time, that's contingent on removing the tub, removing one window and replacing the other. That window replacement is kind of a big deal because we'll be going with a much smaller unit that is up higher in the wall. We'll see...

Sunday, September 5, 2021

Things have escallated

 Oh the joys of working on a 100+ year old house.

For my next magical trick I decided I ought to jack up the enclosed porch, it had a case of the sags...


It's hard to tell from the picture but it sags to the front and to the center. The sag had then caused the step under the door to tip in which let water in and rotted the step out.

I started jacking under the left side, the corner in the front of the picture. That went pretty well, I've done work like this before and we have the right equipment for the job.


This is the "small" jack, it's a 4 ton unit, handy for these kind of jobs because it's short. We've also got a 6 ton that is a little beefier and a massive 12 ton for big jobs.

It's important to put a piece of scrap lumber between the jack and what you're jacking to prevent these kind of problems. However this was just a symptom of a larger issue.



That south end of the porch was just rotted away to nothing. The beam was a 6"x6"...

The last couple feet of the beam were still good so I opted to keep it. I went underneath and added a 4 foot section of 2"x8" and then put 174" of 2x8 to replace what we had removed.



With 6x6 beams in short supply I opted to use 4x 2x8s to make up the thickness. They match up nicely to the beam that remains while being a little bit taller.


The porch sits on these pipes. I think the screw part was an attempt to make the height adjustable but years of sitting outside have seized the threads. We ended up cutting off the part sticking above the pipe.


I cut these plates to go between the pipes and the wood to keep the pipes from pushing up into the wood. They're 4" wide and 7.5" long to distribute the load. I'm not sure of the thickness, probably 1/8", less than 1/4" certainly. For now they're just held in place by gravity but I probably should tack weld them to the pipes, they're kind of annoying to handle while jacking up the house.


The trim boards came apart when I removed them so I made new ones, they're just 1x6. The new step is 2x8 left over from the beam replacement. It fits perfectly for height. I had to cut away more on the right than the left to get rid of some rot. In retrospect I should have made it go all the way under the trim boards. I may revisit this again later, I was fighting rain and just wanted to get the job done. You can see we'll need to replace some flooring at some point in the future.

We had just a little paint left over after painting the house so I slapped it into the new work to protect it for the winter.

Also on the list for this trip but not photographed were a new light in the kitchen. The thing that was there hung on a chain right at head level so it had to go. I also finally replaced the door handle on the screen door. The inside handle was broken which made getting out a tricky proposition. Finally I put in a couple screws where the screen door was broken. The previous occupant had "fixed" it with tape. Maybe in October I'll take it apart and glue it for a better repair.


Wednesday, July 21, 2021

A secret revealed

 I've been hiding something from you, something that has eaten up a significant amount of my time and energy. Actually, some of you probably already know about this but for the rest of you.


This is the Cushman house, the parcel of land it sits on wraps around the southern end of our property. Last fall we got word that it was for sale at quite an attractive price. Dad asked me what I thought and I replied "If you don't buy it I will."


The house is originally from about 1888 but was added on to before 1920. We know that because the last owner's grandparents moved there in 1920 and the addition was already there. In this shot we're facing south west, this is what I call "the new house" because its the addition.


Facing north west, this is the original house. I haven't gotten pictures yet but from the basement it's easy to see the separation, the original house sits on hand hewn beams that are basically trees made flat on one side. The addition is sawn lumber. The house is kind of sad, not much has been done to it for the last 30 years.


The barn is a completely different story, it was build around 2007. We actually watched it's construction over several years.

The south face of the barn still doesn't have doors, that black stuff is fabric. The previous owner joked that he never did anything with the doors because "the town might jack up the taxes if it was actually finished."

The first time dad I went into the house we expected it to be musty and moldy. It's an old house and the last occupant was an elderly widower. We were surprised to find it dry and not smelly, the floors don't squeak or bounce and although nothing in the house is square there isn't anything structurally wrong with it.

Knowing that the house was sound I spent the whole winter pondering. Our first notions were to knock the place down or to sell it. In the end neither really suited, its too good a house to knock down but not really valuable enough to sell and in selling it we lose the barn, you couldn't really sell the house without the barn...

So this spring, like an idiot, I decided it needed painting.


We spent a whole day power washing and scraping paint. Remember dad's power washer? This is why I took the time to get it going.

Another day was spent masking windows. I planned to spray the paint on and I'm really glad we did.


An airless paint sprayer is basically a hydraulic paint gun. The pump pressurizes paint in the hose and it atomizes when you pull the trigger on the sprayer. This allows the pump to draw paint directly from a bucket which simplifies reloads.


With the sprayer we were able to paint the whole house in a day.


This is the north face of the house and one I really wanted to get right as its the most visible from the road. You can see the huge difference the new paint makes. I left the insulation on the window at the bottom right since that window is in the bathroom, right next to the toilet. Eventually that window will be replaced with a small window, high in the wall. It'll give some light into the bathroom but will be more private.

The whole house takes about 6 gallons of paint. With 10 gallons we painted almost everything twice but ran out of paint before we could make a second coat on the high up areas. The spraying took 2 days but the first day we only painted up about 8 feet. The explanation of that is a story in itself...

Anyway, whats next? Well I've already bought a new water heater. The one in the house was turned off 30 years ago because "it cost too much to use" and sat full for all that time. The state of Maine had a great rebate on a hybrid water heater so one is now there waiting to be installed. After that the house needs "a new everything" starting with the kitchen and bathroom. I don't have good pictures but the kitchen was torn apart 30 years ago and never put back together. The bathroom is basically functional but really ugly.

After that it'll be a long term project reworking each room, replacing windows and adding insulation. Hopefully improving the livability and maintainability of the whole place. The thinking is that we really can't make the house any less valuable than it is right now so why not give it a shot...